Taking Shape
The tees are done. The fairways and rough areas are primarily done. Now, it's time for Arnt Construction to turn their attention to the greens and bunkers. A cavity is created for the green, and in this case, stakes are used to mark the grades of the sub-surface. We can see the designed contours of the green including high and low points.
07.15.2020 - This is the cavity for the 5th green. The stakes with the green ribbons mark the perimeter of the green. There are also stakes with yellow ribbons marking the location of a future green-side bunker. (This cavity has not been created yet.) The stakes in the middle of the green show us the contours. In the distance, Leibold Irrigation is hard at work on the irrigation.